|
| Set Construction |
TITLE |
+ |
- |
|
FILE NAME |
+ |
- |
|
DATE |
+ |
- |
|
POSITION |
+ |
- |
|
|
|

More Defiance and Rusty Cork progress642 viewsMade of Super Sculpey, aluminum and brass tubing/rods
|
|

More Defiance and Rusty Cork progress 2665 viewsTiny details on the mini-defiance
|
|

More ship steps830 viewsTwo new stair cases have been added connecting the mid deck to the upper decks.
|
|

New stairs810 viewsMore stairs added to the ship.
|
|

Rope Detailing1563 viewsMike Strain touched up the silver parts of the wire ropes that made themselves known after the pliers had an incident with them.
|
|

Rope Details1121 viewsSome of the extra rope details being made for the additional rope section
|
|

Rope Pegs and Shelf1471 viewsThis shelf was built by Mike Strain and will go along the inside edge of the ship
|
|

Roughed in front side sections1110 viewsHere I'm adding on more to the front part of the ship. These are the last two side pieces needed for episode 1 of Zombie Pirates.
|
|

Rusty Cork Paint Progress604 viewsHere's the Rusty Cork getting painted up. The sails and deck details still need to be painted.
|
|

Rusty Cork Sails727 viewsA sculpey sail over a wire mesh to keep it's shape.
|
|

Ship Armatures611 viewsHere are the mini-ship armatures which will be covered in Sculpey and baked. The masts are made of brass and the hulls are 3 pieces of aluminum which are cut, drilled, pegged together and epoxied.
|
|

Ship Base Complete939 viewsThe lower frame was added to give the entire rear of the ship an extra 9 inches in height.
|
|
|
|